This PUE calculator works out a data centre’s or server room’s Power Usage Effectiveness: how much of the energy you pay for actually reaches the IT equipment, and what the rest costs each year. It runs entirely in your browser: nothing you type is sent to our server.

Loading the tool… It runs in your browser and needs JavaScript.

What PUE means

PUE = total facility energy ÷ IT equipment energy. A PUE of 1.0 would mean every kilowatt goes to servers, storage and network gear; 2.0 means you use as much again for cooling, UPS losses, power distribution and lighting. DCiE is the inverse, as a percentage.

PUEDCiETypical of
1.1-1.283-91%Large modern sites with free cooling
1.3-1.567-77%Well-run colocation and enterprise data centres
1.6-2.050-63%Older data centres
Over 2.0Under 50%Small server rooms with comfort air conditioning

Measuring it properly

  • Measure total power at the utility meter and IT power at the UPS output or the PDUs.
  • Use a full year of energy (kWh), not one instant reading: cooling load changes with the seasons. ISO/IEC 30134-2 defines the method.
  • Server rooms gain most from blanking panels, hot/cold aisle separation and raising the cold-aisle temperature within the ASHRAE recommended range.

How we checked it

We checked the outputs on 11-12 October 2026: 1,500 kW total and 1,000 kW IT gives PUE 1.50, DCiE 66.7%, 4,380 MWh of overhead a year and 657,000 at 0.15 per kWh.

Frequently asked questions

What is a good PUE?

Below 1.5 is good for an enterprise data centre; large hyperscale sites run around 1.1-1.2. A small server room cooled by office air conditioning is often above 2.0.

How do I calculate PUE?

Divide the total power drawn by the facility by the power drawn by the IT equipment. 1,500 kW total and 1,000 kW IT gives a PUE of 1.5.

Can PUE be less than 1?

No. The IT load is part of the total, so PUE is always 1.0 or more. A lower value means a measurement error.